Pascal Klein

Dipl. Ing. ETH/SIA

Seri Saujana Cable Stayed Bridge Putrajaya Malaysia

World’s first cable stayed arch bridge crossing the Putrajaya artificial lake, spanning 300 m. Located in Putrajaya – the Federal administrative centre of Malaysia (seat of The government). Completion 2003.

Client: Putrajaya Holdings SDN BHD.

Structural Design: PJSI Consultants SDN BHD

Contractor: Road Builder (M) Holdings Bhd

Stay Cable and Hanger Technology: BBR Malaysia SDN BHD.


Contribution of Pascal Klein (BBR): Cable related and construction engineering, site supervision
Photos: Pascal Klein, BBR Malaysia SDN BHD

Video: Hafiz Abdul Halim – Youtube

Next Post

Previous Post

© 2024 Pascal Klein

Theme by Anders Norén