Single H-Pylon Cable Stayed Bridge on the European Route E6. Concrete Deck 15.0 m wide, main span 105.0 m. Completion 2017.
Temporary Works design by Klein Engineering:
– Deck and Pylon FalseworkS
– Steel Tube Foundations (Ice/Water Pressure)
Bridge Design: Reinertsen AS
Contractor: Implenia Norge AS
photo: Implenia Norge AS