Pascal Klein

Dipl. Ing. ETH/SIA

14th of July Bridge Baghdad Iraq Suspender Replacement

Self anchored Suspension Bridge (Riveted Steel) On Arbataash Tamuz street over the Tigris River in Baghdad. length 336 m. Constructed in the Year 1962 by David Steinman.

Suspender replacement 2004 (locked coil)

Contractor: SPC Specialized Prestressing Co. Karrada Baghdad

Contribution of Pascal Klein and Nik Winkler: Status assessment and cable related engineering for repair works
Photos: Specialized Prestressing Co.

Next Post

Previous Post

© 2024 Pascal Klein

Theme by Anders Norén